top of page

County Planning Commission to Review Quarry Road Secure Space Self Storage Facility



Over 200 emails were written and the Sweetwater Community Planning Group meeting was packed with residents speaking against the proposed Storage Facility on Quarry Road.


Let me refresh your memory:


The storage building is three stories.

  • The basement is 17' high and viewable in places

  • The first floor is 18' high

  • The second floor is 21' high

  • All three levels together total 132,425SF

  • The building footprint is 44,129SF

  • There are approximately 70 RV Storage parking spaces along the perimeter: 30 facing Quarry Road, 24 facing the golf course, and 15+ at the east end

  • The RV lots have a metal canopy or possibly solar displays, it is unclear if there will be reflection to the surrounding areas

  • The building area has been moved closer to Sweetwater Road

  • Quarry Road looks like it has been moved closer to the neighbors across the street in some places but it's difficult to be sure by the plans

  • The building has a 10' easement from the rental homes located on the Sunnyside Stables property

  • The renderings show what the trees will look like in ten years

  • There are 34 cameras

  • The illuminance is measured on a scale

  • The lights are on all night for security and resemble an airport runway amid the darkened neighborhood

  • The lights are of a tennis court nature, facing downward, but the illumination will still be visible

  • The walking trail is between the structure wall and the property line, not much of a view and you would have difficulty getting a horse to walk on it.

  • The structure is visible from Quarry Road, Sweetwater Road, SR54, SR125, the Bonita Golf Course and the surrounding neighborhoods.


According to San Diego County Land Use & Environmental Planner Bianca Lorenzana, the project is still alive. Ignoring the protests of the Bonita-Sunnyside community, the developers have decided to take the project forward for a Planning Commission hearing. The hearing is scheduled for December 6, 2024 and Bianca will be sending out an email next week.


Here are the details:



In the meantime, mark your calendars for the December 6th hearing and the December 3rd Sweetwater Community Planning Group meeting as this topic will be on their agenda.





Comentarios

Obtuvo 0 de 5 estrellas.
Aún no hay calificaciones

Agrega una calificación

Top Stories

Categories 

Stay informed with the latest Sunnyside updates. Subscribe to our newsletter for in-depth coverage of news and events.

Stay Connected

  • Instagram
  • Facebook
  • Twitter

© 2024 Sunnyside Commonsense All rights reserved. Designed by RobinWebConsulting

bottom of page